Case study · FRAEW · PAS 9980 · Portsmouth

A 1970s block with no records: every wall proven by opening up.

McKay Turner Consulting carried out the intrusive survey and PAS 9980 fire risk appraisal of the external walls at Avalon House, an 18-apartment mixed-use building in Portsmouth city centre, where no construction records existed.

Avalon HousePortsmouth2025
Avalon House, a four-storey 1970s building with a grid of aluminium curtain walling, Portsmouth city centre
18
apartments
11.1m
to the top floor
1970s
construction
4
external wall types
0
drawings available
1day
intrusive survey

The building

A mid-century corner block in Portsmouth

Avalon House dates from the 1970s and occupies a city-centre corner plot, with commercial units at ground floor and 18 apartments over three upper storeys. Its top occupied floor sits just over 11 metres above ground.

The concrete-framed building has four distinct external wall types: aluminium curtain walling, cast concrete to the lift shaft, a brick cavity wall and profiled aluminium plank cladding.

The brief

Reassurance for lenders, starting from a blank page

The owner needed a FRAEW to PAS 9980:2022 to give reassurance to mortgage lenders and to inform the building's fire risk assessment.

No drawings or construction records were available. The building's appearance suggested a largely masonry structure, but that was not enough to rule out an appraisal, so every wall type had to be established by intrusive investigation.

How we did it

One day on site, every wall type opened up

We reviewed the planning record, title information and the design guidance in force in the 1970s, then planned opening-up locations on each of the four wall types.

In a single day on site, working from a mobile tower and ladders, we removed spandrel panels and cladding planks, took out bricks at slab level and drilled the concrete, recording every build-up layer by layer. Each wall type was then scored against the PAS 9980 risk factors, and the report was independently reviewed by a fire engineer before issue.

Step 1

Desktop review

Planning, title and 1970s guidance reviewed.

Step 2

Opening-up plan

Locations set on all four wall types.

Step 3

Intrusive survey

One day on site; panels, planks, brick and concrete opened up.

Step 4

Appraisal & review

PAS 9980 risk factors scored; reviewed by a fire engineer.

What the evidence showed

Four wall types on a concrete frame

The survey established the construction of each wall type, all of which are backed by blockwork or concrete, and gave the owner a reliable record of a building that previously had none.

Wall type 1Aluminium curtain walling (~55%)
Wall type 2Cast concrete, lift shaft (~5%)
Wall type 3Brick cavity wall on blockwork (~25%)
Wall type 4Profiled aluminium planks (~10%)
A section of aluminium plank cladding removed below a window to reveal the build-up behind
Cladding planks removed to confirm the build-up behind.
A masonry drill bit held against a tape measure beside a concrete wall
Drilling and measuring to establish the concrete wall thickness.

The outcome

A clear, evidence-based position for owner and lenders.

The FRAEW gave the owner a wall-by-wall risk rating grounded in what was actually found on site, together with clear, prioritised recommendations to inform the fire risk assessment and future planning for the building.

For a building with no construction records, that evidence base is what lenders and fire risk assessors need.

No drawings to go on, so every wall was proven on site.

Work with us

Need a PAS 9980 appraisal you can act on?

McKay Turner Consulting carries out FRAEWs, EWS1 assessments, intrusive cladding investigations and façade fire-safety consultancy for residential and mixed-use buildings of every age and height across the UK.

© McKay Turner Consulting LtdFRAEW · PAS 9980:2022